The current, original, EMCS is not functioning properly and is no longer being supported by the manufacturer. Light fixtures are old and do not meet the new energy consumption requirements by Code or ASHRAE Standards. GSA contracted Setty & Associates to design and install a fully functional Energy Management Control System (EMCS) in the Silver Spring Metro Center 1. S&A is providing the following architectural, mechanical and electrical services:
|